• Toggle Accessibility Statement
  • Home
  • Skip to Main Content
  • Sitemap
Menu
gov.ph
  • Maribojoc
    • General Information
    • History
    • Maribojoc Hymn
    • Seals and Symbols
    • Vision, Mission, Goals
    • Population & Settlements
  • Executive
    • Mayor Romulo A. Manuta
  • Legislative
    • Vice Mayor Engr. Emilio J. Castilla
    • Office of the Vice Mayor and Sanggunian
  • Barangay
    • Agahay
    • Aliguay
    • Anislag
    • Bayacabac
    • Bood
    • Busao
    • Cabawan
    • Candavid
    • Dipatlong
    • Guiwanon
    • Jandig
    • Lagtangon
    • Lincod
    • Pagnitoan
    • Poblacion
    • Punsod
    • Punta Cruz
    • San Isidro
    • San Roque
    • San Vicente
    • Tinibgan
    • Toril
  • Projects
    • Social Welfare Development
    • Economic Development
    • Infrastructure and Physical Development
  • Maribojoc Hotline Numbers
  • AUXILIARY MENU
  • Fiscal Matters
    • CY 2012 Gender and Development Fund Utilization
    • CY 2012 & 2013 Statement of Debt Service
    • CY 2012 Annual Procurement Plan
    • CY 2012, 2013 & 2014 Bid Results on Civil Works & Goods and Services
    • CY 2014 & 2015 Items to Bid
    • CY 2012, 2013 & 2014 Abstract of Bids as Calculated
    • CY 2012 & 2013 Performance Challenge Fund Utilization
    • CY 2014 Supplemental Annual Procurement Plan
    • CY 2012, 2013 & 2014 Municipal Disaster Risk Reduction Management – Calamity Fund Utilization
    • Office of the Bids & Awards Committee
    • CY 2014 Notice of Award
  • gov.ph
  • Maribojoc
    • General Information
    • History
    • Maribojoc Hymn
    • Seals and Symbols
    • Vision, Mission, Goals
    • Population & Settlements
  • Executive
    • Mayor Romulo A. Manuta
  • Legislative
    • Vice Mayor Engr. Emilio J. Castilla
    • Office of the Vice Mayor and Sanggunian
  • Barangay
    • Agahay
    • Aliguay
    • Anislag
    • Bayacabac
    • Bood
    • Busao
    • Cabawan
    • Candavid
    • Dipatlong
    • Guiwanon
    • Jandig
    • Lagtangon
    • Lincod
    • Pagnitoan
    • Poblacion
    • Punsod
    • Punta Cruz
    • San Isidro
    • San Roque
    • San Vicente
    • Tinibgan
    • Toril
  • Projects
    • Social Welfare Development
    • Economic Development
    • Infrastructure and Physical Development
  • Maribojoc Hotline Numbers
    • Accessibility Statement
    • High Contrast
    • Skip to Content
    • Skip to Footer

Municipality of Maribojoc Official Logo
Republic of the Philippines
Municipality of Maribojoc

Philippine Standard Time:

CY 2014 & 2015 Items to Bid

  • Fiscal Matters
    • CY 2012 Gender and Development Fund Utilization
    • CY 2012 & 2013 Statement of Debt Service
    • CY 2012 Annual Procurement Plan
    • CY 2012, 2013 & 2014 Bid Results on Civil Works & Goods and Services
    • CY 2014 & 2015 Items to Bid
    • CY 2012, 2013 & 2014 Abstract of Bids as Calculated
    • CY 2012 & 2013 Performance Challenge Fund Utilization
    • CY 2014 Supplemental Annual Procurement Plan
    • CY 2012, 2013 & 2014 Municipal Disaster Risk Reduction Management – Calamity Fund Utilization
    • Office of the Bids & Awards Committee
    • CY 2014 Notice of Award
  • You are here:
  • Home ›
  • Fiscal Matters ›
  • Current: CY 2014 & 2015 Items to Bid
Nov.29, 2014 – ITB – Purchase of Sound System, IT Equipment, Aircondition, Furniture & Fixture and Basic Equipment for Senior Citizen_p1of2
Nov.29, 2014 – ITB – Purchase of Sound System, IT Equipment, Aircondition, Furniture & Fixture and Basic Equipment for Senior Citizen_p2of2
Nov.29, 2014 – ITB – Purchase of Office Supplies for Different Offices_p1of2
Nov.29, 2014 – ITB – Purchase of Office Supplies for Different Offices_p2of2
Nov. 18, 2014 – ITB – Purchase of Grocery Items for Supplemental Feeding Program_p1of2
Nov. 18, 2014 – ITB – Purchase of Grocery Items for Supplemental Feeding Program_p2of2
Nov. 18, 2014 – ITB – Purchase of Sound System, IT Eqiupment, Aircondition, Furniture & Fixture and Basic Equipment for Senior Citizen_p1of2
Nov. 18, 2014 – ITB – Purchase of Sound System, IT Eqiupment, Aircondition, Furniture & Fixture and Basic Equipment for Senior Citizen_p2of2
Nov. 19, 2014 – ITB – Purchase of Office Supplies for Different Offices of LGU-Maribojoc_p1of2
Nov. 19, 2014 – ITB – Purchase of Office Supplies for Different Offices of LGU-Maribojoc_p2of2
Nov. 19, 2014 – ITB – Purchase of Materials for the Construction of Household Toilets_p1of2
Nov. 19, 2014 – ITB – Purchase of Materials for the Construction of Household Toilets_p2of2
Nov. 19, 2014 – ITB – Rehabilitation of Waterworks System-Installation of Pumping System_p1of2
Nov. 19, 2014 – ITB – Rehabilitation of Waterworks System-Installation of Pumping System_p2of2
Sept 20, 2014 – ITB – Acquisition of DRRM Rescue & Responce Vehicle_p1of2
Sept 20, 2014 – ITB – Acquisition of DRRM Rescue & Responce Vehicle_p2of2
Sept 13, 2014 – ITB – Purchase of Materials for completion of Multi-Purpose Building_p1of2
Sept 13, 2014 – ITB – Purchase of Materials for completion of Multi-Purpose Building_p2of2
Aug 29, 2014 – ITB – Acquisition of DRRM Rescue & Response Vehicle_p1of2
Aug 29, 2014 – ITB – Acquisition of DRRM Rescue & Response Vehicle_p2of2
Aug 21, 2014 – ITB – Construction of TB DOTS Building(Supply & Delivery of Construction Materials)_p1of2
Aug 21, 2014 – ITB – Construction of TB DOTS Building(Supply & Delivery of Construction Materials)_p2of2
Aug 13, 2014 – ITB – Purchase of Grocery Items for Supplemental Feeding Program_p1of2
Aug 13, 2014 – ITB – Purchase of Grocery Items for Supplemental Feeding Program_p2of2
Aug 13, 2014 – ITB – Purchase of Motorcycle for Waterworks Use of LGU_p1of2
Dec.06, 2014 – ITB – Construction of Multi-Purpose Building(Supply & Delivery of Construction Materials_p1of2
Dec.06, 2014 – ITB – Construction of Multi-Purpose Building(Supply & Delivery of Construction Materials_p2of2
Dec.06, 2014 – ITB – Construction of Multi-Purpose Building-Installation of Roofing_p1of2
Dec.06, 2014 – ITB – Construction of Multi-Purpose Building-Installation of Roofing_p2of2
Dec.06, 2014 – ITB – Construction of Barangay Health Center(Supply & Delivery of Construction Materials)_p1of2
Dec.06, 2014 – ITB – Construction of Barangay Health Center(Supply & Delivery of Construction Materials)_p2of2
Dec.06, 2014 – ITB – Construction of Barangay Health Center-Installation of Roofing_p1of2
Dec.06, 2014 – ITB – Construction of Barangay Health Center-Installation of Roofing_p2of2
Dec.06, 2014 – ITB – Construction of Day Care Center(Supply & Delivery of Construction Materials)_p1of2
Dec.06, 2014 – ITB – Construction of Day Care Center(Supply & Delivery of Construction Materials)_p2of2
Dec.06, 2014 – ITB – Construction of Day Care Center-Installation of Roofing_p1of2
Dec.06, 2014 – ITB – Construction of Day Care Center-Installation of Roofing_p2of2
Dec.09, 2014 – ITB – Construction of Public Market(Supply & Delivery of Construction Materials)_p1of2
Dec.09, 2014 – ITB – Construction of Public Market(Supply & Delivery of Construction Materials)_p2of2
Dec.09, 2014 – ITB – Construction of Public Market-Installation of Roll-up Doors_p1of2
Dec.09, 2014 – ITB – Construction of Public Market-Installation of Roll-up Doors_p2of2
Dec.09, 2014 – ITB – Construction of Public Market-Installation of Roofing_p1of2
Dec.09, 2014 – ITB – Construction of Public Market-Installation of Roofing_p2of2
Dec.19, 2014 – ITB – Purchase of Rescue Equipment(Chainsaw)(Supply & Delivery of Chainsaw)_p1of2
Dec.19, 2014 – ITB – Purchase of Rescue Equipment(Chainsaw)(Supply & Delivery of Chainsaw)_p2of2
Jan. 14, 2015 – ITB – Rehabilitation of Waterworks System-Installation of Pumping System_p1of2
Jan. 14, 2015 – ITB – Rehabilitation of Waterworks System-Installation of Pumping System_p2of2
Jan.14, 2015 – ITB – Purchase of Plastic Barrel Floater for Abatan Docking Platform_p1of2
Jan.14, 2015 – ITB – Purchase of Plastic Barrel Floater for Abatan Docking Platform_p2of2
Jan.14, 2015 – ITB – Purchase of Equipment for Science Apparatus_p1of2
Jan.14, 2015 – ITB – Purchase of Equipment for Science Apparatus_p2of2
Jan.14, 2015 – ITB – Purchase of Rescue Equipment(Chainsaw)(Supply and Delivery of Chainsaw)_p1of2
Jan.14, 2015 – ITB – Purchase of Rescue Equipment(Chainsaw)(Supply and Delivery of Chainsaw)_p2of2
Jan.16, 2015 – ITB – Construction of Public Market(Supply and Delivery of Construction Materials_p1of2
Jan.16, 2015 – ITB – Construction of Public Market(Supply and Delivery of Construction Materials_p2of2
Jan.16, 2015 – ITB – Construction of Public Market-Installation of Roll-Up Doors_p1of2
Jan.16, 2015 – ITB – Construction of Public Market-Installation of Roll-Up Doors_p2of2
Jan.16, 2015 – ITB – Construction of Public Market-Installation of Roofing_p1of2
Jan.16, 2015 – ITB – Construction of Public Market-Installation of Roofing_p2of2
Jan.16, 2015 – ITB – Construction of Multi-Purpose Building(Supply and Delivery of Construction Materials_p1of2
Jan.16, 2015 – ITB – Construction of Multi-Purpose Building(Supply and Delivery of Construction Materials_p2of2
Jan. 16, 2015 – ITB – Construction of Multi-Purpose Building-Installation of Roofing_p1of2
Jan. 16, 2015 – ITB – Construction of Multi-Purpose Building-Installation of Roofing_p2of2
Jan. 16, 2015 – ITB – Construction of Barangay Health Center(Supply and Delivery of Construction Materials)_p1of2
Jan. 16, 2015 – ITB – Construction of Barangay Health Center(Supply and Delivery of Construction Materials)_p2of2
Jan. 16, 2015 – ITB – Construction of Barangay Health Center-Installation of Roofing_p1of2
Jan. 16, 2015 – ITB – Construction of Barangay Health Center-Installation of Roofing_p2of2
Jan. 16, 2015 – ITB – Construction of Day Care Center(Supply and Delivery of Construction Materials)_p1of2
Jan. 16, 2015 – ITB – Construction of Day Care Center(Supply and Delivery of Construction Materials)_p2of2
Jan. 16, 2015 – ITB – Construction of Day Care Center-Installation of Roofing_p1of2
Jan. 16, 2015 – ITB – Construction of Day Care Center-Installation of Roofing_p2of2
Jan. 24, 2015 – ITB – Purchase of Materials for Construction of Multi-Purpose Building(Hardwares)_p1of2
Jan. 24, 2015 – ITB – Purchase of Materials for Construction of Multi-Purpose Building(Hardwares)_p2of2
Jan. 24, 2015 – ITB – Purchase of Materials for Construction of Multi-Purpose Building(Roofing)_p1of2
Jan. 24, 2015 – ITB – Purchase of Materials for Construction of Multi-Purpose Building(Roofing)_p2of2
Jan. 24, 2015 – ITB – Purchase of Materials for Construction of Multi-Purpose Building(Steel Window Casement)_p1of2
Jan. 24, 2015 – ITB – Purchase of Materials for Construction of Multi-Purpose Building(Steel Window Casement)_p2of2
Jan. 23, 2015 – ITB – Purchase of Plastic Barrel Floater for Abatan Docking Platform_p1of2
Jan. 23, 2015 – ITB – Purchase of Plastic Barrel Floater for Abatan Docking Platform_p2of2
Jan. 23, 2015 – ITB – Purchase of Equipment for Science Apparatus_p1of2
Jan. 23, 2015 – ITB – Purchase of Equipment for Science Apparatus_p2of2
Jan. 24, 2015 – ITB – Purchase of Materials for the Construction of Barangay Health Center(Hardwares)_p1of2
Jan. 24, 2015 – ITB – Purchase of Materials for the Construction of Barangay Health Center(Hardwares)_p2of2
Jan. 24, 2015 – ITB – Purchase of Materials for the Construction of Barangay Health Center(Roofing)_p1of2
Jan. 24, 2015 – ITB – Purchase of Materials for the Construction of Barangay Health Center(Roofing)_p2of2
Feb. 7, 2015 – ITB – Purchase of Materials for Construction of Multi-Purpose Building(Hardwares)_p1of2
Feb. 7, 2015 – ITB – Purchase of Materials for Construction of Multi-Purpose Building(Hardwares)_p2of2
Feb. 7, 2015 – ITB – Purchase of Materials for Construction of Multi-Purpose Building(Roofing)_p1of2
Feb. 7, 2015 – ITB – Purchase of Materials for Construction of Multi-Purpose Building(Roofing)_p2of2
Feb. 7, 2015 – ITB – Purchase of Materials for Construction of Multi-Purpose Building(Steel Window Casement)_p1of2
Feb. 7, 2015 – ITB – Purchase of Materials for Construction of Multi-Purpose Building(Steel Window Casement)_p2of2
Feb. 7, 2015 – ITB – Purchase of Materials for the Construction of Barangay Health Center(Hardwares)_p1of2
Feb. 7, 2015 – ITB – Purchase of Materials for the Construction of Barangay Health Center(Hardwares)_p2of2
Feb. 7, 2015 – ITB – Purchase of Materials for the Construction of Barangay Health Center(Roofing)_p1of2
Feb. 7, 2015 – ITB – Purchase of Materials for the Construction of Barangay Health Center(Roofing)_p2of2
Feb. 24, 2015 – ITB – Purchase of Day Care Learning Equipment_p1of2
Feb. 24, 2015 – ITB – Purchase of Day Care Learning Equipment_p2of2
Feb. 24, 2015 – ITB – Concreting of Bayacabac Farm to Market Road(Ready Mix Concrete)_p1of2
Feb. 24, 2015 – ITB – Concreting of Bayacabac Farm to Market Road(Ready Mix Concrete)_p2of2
Feb. 24, 2015 – ITB – Concreting of Bayacabac Farm to Market Road(Sub-Base Materials)_p1of2
Feb. 24, 2015 – ITB – Concreting of Bayacabac Farm to Market Road(Sub-Base Materials)_p2of2
Feb. 25, 2015 – ITB – Construction of Day Care Center – Hardware Materials(Tinibgan)_p1of2
Feb. 25, 2015 – ITB – Construction of Day Care Center – Hardware Materials(Tinibgan)_p2of2
Feb. 24, 2015 – ITB – Construction of Barangay Health Center – Hardware Materials(Tinibgan)_p1of2
Feb. 24, 2015 – ITB – Construction of Barangay Health Center – Hardware Materials(Tinibgan)_p2of2
Feb. 24, 2015 – ITB – Purchase of IT Equipment for Different Offices for LGU-Maribojoc_p1of2
Feb. 24, 2015 – ITB – Purchase of IT Equipment for Different Offices for LGU-Maribojoc_p2of2
Feb. 24, 2015 – ITB – Rehabilitation of Maribojoc Waterworks System(Zone 1) Purchase of Values & Fittings_p1of2
Feb. 24, 2015 – ITB – Rehabilitation of Maribojoc Waterworks System(Zone 1) Purchase of Values & Fittings_p2of2
Feb. 25, 2015 – ITB – Construction of Day Care Center – Roofings (Tinibgan)_p1of2
Feb. 25, 2015 – ITB – Construction of Day Care Center – Roofings (Tinibgan)_p2of2
Feb. 24, 2015 – ITB – Construction of Barangay Health Center – Roofings (Tinibgan)_p1of2
Feb. 24, 2015 – ITB – Construction of Barangay Health Center – Roofings (Tinibgan)_p2of2
Mar. 5, 2015 – ITB – Purchase of one (1) unit Motorcycle DEMO Farm Use_p1of2
Mar. 5, 2015 – ITB – Purchase of one (1) unit Motorcycle DEMO Farm Use_p2of2
Mar. 5, 2015 – ITB – Purchase of Training Equipment for DEMO Farm Use_p1of2
Mar. 5, 2015 – ITB – Purchase of Training Equipment for DEMO Farm Use_p2of2
Mar. 7, 2015 – ITB – Rehabilitation of Waterworks System-Well Drilling and Installation of Casing (Wadis-Zone 2)_p1of2
Mar. 7, 2015 – ITB – Rehabilitation of Waterworks System-Well Drilling and Installation of Casing (Wadis-Zone 2)_p2of2
Mar. 7, 2015 – ITB – Rehabilitation of Waterworks System-Installation of Submersible Pump(inc. Accessories, Controls, Electrical)(Wadis-Zone 2)_p1of2
Mar. 7, 2015 – ITB – Rehabilitation of Waterworks System-Installation of Submersible Pump(inc. Accessories, Controls, Electrical)(Wadis-Zone 2)_p2of2
Mar. 7, 2015 – ITB – Rehabilitation of Waterworks System-Various Items (Wadis-Zone 2)_p1of2
Mar. 7, 2015 – ITB – Rehabilitation of Waterworks System-Various Items (Wadis-Zone 2)_p2of2
Mar. 7, 2015 – ITB – Rehabilitation of Waterworks System-Acquisition of Power Generator (Wadis-Zone 2)_p1of2
Mar. 7, 2015 – ITB – Rehabilitation of Waterworks System-Acquisition of Power Generator (Wadis-Zone 2)_p2of2
Mar. 7, 2015 – ITB – Rehabilitation of Waterworks System-Valves & Fittings for the Installation of Transmission & Distribution Pipelines(Pagnitoan & Aliguay Water Source)_p1of2
Mar. 7, 2015 – ITB – Rehabilitation of Waterworks System-Valves & Fittings for the Installation of Transmission & Distribution Pipelines(Pagnitoan & Aliguay Water Source)_p2of2
Mar. 7, 2015 – ITB – Rehabilitation of Waterworks System-Installation of Water Pumping(Pagnitoan Water Source-Zone 3)_p1of2
Mar. 7, 2015 – ITB – Rehabilitation of Waterworks System-Installation of Water Pumping(Pagnitoan Water Source-Zone 3)_p2of2
Mar. 10, 2015 – ITB – Rehabilitation of Waterworks System-Various Items (Pagnitoan Water Source-Zone 3)_p1of2
Mar. 10, 2015 – ITB – Rehabilitation of Waterworks System-Various Items (Pagnitoan Water Source-Zone 3)_p2of2
Mar. 10, 2015 – ITB – Purchase of IT Equipment for Different Offices for LGU-Maribojoc_p1of2
Mar. 10, 2015 – ITB – Purchase of IT Equipment for Different Offices for LGU-Maribojoc_p2of2